Are you Planning to Invest  in Land Part 2:

In  Part 1 we discussed where to invest and why to invest ?? and various factors why to Invest in Land??
significantly why invest in DholeraSIR??
In Part 1 we also discussed the  Infrastructure of  DholeraSIR like the Airport, Express Highway, Transport Hub, and Solar Park.
In this Part, let's Check Which Company/Firm invested in DholeraSIR and what're their Objectives??


DholeraSIR Road lines by L&T
1. L&T: Larsen and Turbo company get the project of developing road lines of Dholera SIR The scope of work includes the construction of roads, drains, bridges, water network, sewage, and common efficient treatment plants.
Ahmedabad-Dholera Expressway is a high-speed Expressway. which will reduce the total travel time.
Key point L&T Constriction in DholeraSIR:
1. 109km. Long Expressway
2. Constriction of Road
3. Water Network
4. Sewage and Common Efficient Treatment Plant

2.Tata Power:  Tata Power is Developing a large-scale  Solar Power Plant in DholeraSIR.
 
Key Points of Tata Power Plant in Dholera :
  1. PROJECT SIZE: 300 MW
  2. CARBON FOOTPRINT REDUCED: 704340 MT/YEAR
  3. PROJECT TYPE: POWER PRODUCERS
  4. PROJECT COMPLETION TIME: MARCH 2020 - 2023
  5. LAND AREA: 1320 ACRE
  6. NO. OF MODULES: 8,73,012
  7. MODULE TECHNOLOGY: MONOCRYSTALLINE PV MODULES
  8. INDIA'S LARGEST SINGLE AXIS SOLAR TRACKER SYSTEM
Tata Airbus Project 



3. Tata Group:  Stage Set for Tata-Airbus to Manufacture Aircraft. Gujrat Govt. Offer land in DholeraSIR for AIRBUS manufacturing. Gujarat Govt Offers Land at Dholera Sir Where an International Airport Is Coming Up; Consortium to Manufacture C-295 Military Transport Aircraft at the Facility.

Key Point:
Tata Group will check the suitable land for Airbus Project in Gujarat



4.Vedanta-Foxconn: Vedanata and Foxconn sign a joint venture to implement a Semiconductor Plant in DholeraSIR. This will become the first semiconductor chip Manufacturing Plant in India.



Key Point:
1. 300 Acer Land Allotted for Developing this project
2. Project work started in March 2023
3.Vedanata & Foxconn signed MOU with Govt. of Gujarat for an investment of 154000 crores.


These are Some Industrial Giants which invested in DholeraSIR. There are lots of other Industries that Invested in Dholera SIR we will cover them in Part 3.

These companies will bring alot of Employment in DholeraSIR.

If you want to Invest in DholeraSIR connect with us

W: www.aamanigroup.com
Mb: +918866333000



Comments

Popular posts from this blog

Dholera Future: A Look Ahead to 2026

Dholera Infrastructure: Paving the Way for a Sustainable Tomorrow

How the Ahmedabad-Dholera Expressway Enhances Business and Tourism Opportunities