Dholera SIR World Class First Industrial Smart City In Gujarat
Let’s understand Dholera SIR:
Dholera Smart City will emerge as a
“Global Manufacturing and Trading Hub” over the next few years as the city will
be the largest node and the first Greenfield industrial smart city in the
country. It will have state-of-the-art utilities, logistic and social
infrastructure including education, healthcare, other public amenities, and much
more. Dholera Project will have its own Self-Sustaining Eco System consisting
of economic drivers through industrialization, utility & logistic
infrastructure.
Dholera SIR with its
world-class ICT-enabled infrastructure provides an integrated approach to urban
development which can go a long way in contributing to the building of a smart
and sustainable city. Likewise, the ABCD Building at the heart of Dholera City
is operational with the Business & Exhibition center, the administrative
building is housing the City Civic Center, ICT Command Control Room, etc.
Technologies like these can help businesses maintain their operations in times
like the COVID 19 pandemic.
Many more cities like Lavasa in
Maharashtra and Amravati in Andhra Pradesh have also come up with the same idea
of Greenfield smart cities in those states but failed due to being only residential
cities whereas Dholera SIR is an industrial city where there will be a balance
between good living and jobs in the vicinity. The industry will need people to
run it and people will need good living with a pinch of rural life and
facilities of a city at the same place. So, the success is with Dholera Project and
its going to rein for the next few decades in development and job creation.
Giants who have already started in Dholera SIR:
To ease the business needs of the
client, soil filling is done in 2 major industrial plots. Currently, the land
is being allotted to Tata Chemicals Ltd. (126 Acres) for their upcoming lithium-ion-based
battery for Electric Vehicles. ReNew Power Private Limited is to set up a manufacturing
facility for their photo Voltic panels for solar energy (100 Acres), Torrent
Power Ltd. (6 Acres), Chiripal limited (90 Acres), and HPCL (3 Acres) are the
companies already made their presence at India’s first Industrial smart city.
Roads Network at Activation area of Dholera SIR:
Various categories of roads
ranging from 18m ROW to 70m ROW are constructed for the efficient
circulation/movement of people and goods for the Activation Area. The design
and construction of roads is benchmarked against international standards. The
entire road network spread across the activation are of 22.54 sq. km is around
85 km. The use of the latest design software, 3D modeling for design, and the
latest construction methodologies are used to achieve the efficiency of these
networks. Services and utilities running within the road reserves include stormwater
drainage, water supply, sewerage, power, telecommunications, and gas.
Dholera Solar Park:
Since it’s an eco-friendly city,
it will run on a 5000 MW Dholera
Solar Park being developed in two phases in Dholera Special Investment Region.
Out of which 500 MW solar park is ready to run a Greenfield city coming up
approximately 70 km away from Ahmedabad, Gujarat, India. More than 11,000 ha of
land is identified for the development of this solar park which is owned by the
Government of Gujarat. The construction of this massive 5000 MW solar park will
attract an investment of close to about `25,000 Cr. which will generate
employment for more than 20,000 people.
Man-made Creek:
110 mt wide, 15 KM long and 15-meter
deep creek around the activation area will work as a water harvesting device
and water reservoir for the city to keep it cooler by a few celcious. This is the
first of its kind in the country, part of this is already developed.
MRTS: AHMEDABAD TO DHOLERA:
The Mass Rapid Transit System
(MRTS) between Ahmedabad and Dholera is part of the plan to develop a
self-sustained rail-based transportation system in order to provide
connectivity both within Dholera and between Dholera and Ahmedabad for the
movement of people.
Dholera International Airport:
To provide air connectivity to
Dholera Special Investment Region (DSIR) an upcoming International Airport 15
km from the proposed activation area is being developed in an area of 1426
hectares of land. Airports Authority of India (AAI) has prepared the
Feasibility Report and all necessary permission has already been obtained. The Dholera
International Airport is envisaged to cater DSIR & its hinterland
and traffic overflow from Ahmedabad International Airport.
Recent Events:
Gandhinagar: Even as the state
government looks to showcase the Dholera Special Investment Region (SIR) as a
world-class plug-and-play Greenfield industrial smart city at the coming
Vibrant Gujarat Global Summit (VGGS), the chief minister visited the SIR a few
days back to review the progress of various works there.
Bhupendra Patel said Dholera SIR Project
has huge potential for sectors such as aerospace, defense, engineering,
pharmaceuticals, IT, agro and food processing, and renewables. He urged
entrepreneurs to invest in the SIR, which is spread over 920 square kilometers.
“Dholera SIR is not just about industries, as we have also planned to develop a
Special Education Region over 1,000 acres here. An international airport is
also coming up over 1,425 hectares and the Airports Authority of India has
already started work on it,” the chief minister said.