11 Years with Dholera SIR Dream of Narendra Modi
Dholera SIR
Start of a Dream and Selection
of Location Dholera:-
In 2009 Chief Minister Narendra
Modi was knowing that Gujarat is business hub where businessmen started giving
feedback of tough competition from china. To understand china model of
development it started graduating from SEZ to Dholera SIR i.e Special Economic
Zone to Special Investment Region and one such big success was Shenzhen near Hong
Kong which has become hub for mobile and other such world competing industries
in China.
In Indian context there was lot
to be taken care of as we are a democracy and not ruled by communist like
china. So it was necessary to find a land where there would be no resistance
from local farmers and its location is in proximity to connected cities. In
such context in Gujarat Dholera was a forgotten port city once bigger than
Bombay or today’s Mumbai was having maximum government land with farmers land
also given by government for farming after independence gradually over years
moreover this land was barren because of salinity creating challenges in
farming activities and only monsoon was suitable for farming with limited
number of crops possible. This was also located in the midst of Gujarat south
of Ahmedabad, North of Bhavnagar and West of Vadodara almost in the vicinity of
100 kilometers of this major cities of Gujarat.
Planning to execute Dholera
SIR Project:-
Once the dream got into paper
with draft planning in 2011, International Multinationals were enrolled to make
it a Model Region for futuristic Gujarat it is worth mentioning narendra modi
is known to dream big and surely dream very big on Dholera Smart City and 22 villages with 924
sq.kilometre area identified for Dholera SIR and International companies like
Halcrow started designing the plans. Once the planning was approved by 2012
execution of challenge at such huge scale as there were multiple projects like
kalpasar dam for solving Gujarat
water crisis forever and changing the profile of dholera land from saline to fertile
(such experiments had been done in Norway and France successfully) wherein the
gulf of Khambhat where Arabian entered only in high tide would be curtailed
with dam and all river waters of Sabarmati, mahi, bhogavo etc will not go in Arabian
sea and sea water would not enter the gulf area.
Connectivity: with 10 lane expressway(first of its kind in india),
Dholera Metro Rail from Gandhinagar-Ahmedabad-Dholera , LRTS-local road transit
system, Broadgauge Rail Line from Bheemnath and Dholera International Airport
Cargo and Passenger(permission of it was given inspite of it being in range of
100 kms of other airports showing the intent and push for this project)
Water treatment Plants: will
surely create the better systems by processing water for its final usage. Moreover,
50 MLD Desalination Plant costing 276.75 crore with total construction cost
405.95 crore having total project cost 499.16 crore will make water drinkable
for consumption. Drinking water produced by desalination plants is monitored
and tested in the same way as water from filtration plant.
Electricity: with biggest
solar park with Dholera Solar Park is a planned, large scale solar project in Dholera Special Investment Region, Gujarat.
It is categorized as a Ultra Mega Solar Power Project, by the Ministry of New
and Renewable Energy of the Union Government of India. The capacity will be 100
GW by 2030
and torrent power stations Torrent Power Limited (TPL) is all set to
power up Dholera Special Investment Region (DSIR) as Gujarat Electricity
Regulatory Commission (GERC) has in-principally decided to grant a power
distribution licence to the company to supply electricity to the DSIR. Apart
from TPL, Adani Group and Tata Power Limited.
About Author:-
Himanshu Sampat started investing
in Dholera Land since 2010 when Shri Narendra Modi envisaged the Dream of a
Greenfield Smart City Dholera. He has Land
Bank of More than 1,75,00,000 square feet in Dholera Area. After being in
dholera for last 11 years he is sharing his experience to all who need to know
how this dream took shape and what lies in future
Media Contact Details:-
Aamani Group,
+91-8866333000.
Comments